Project Description
Logistics management of the new automated warehouse of finished product and semifinished products of Came Cancelli site in Dosson di Casier (TV).
Central stock
Dimensions: 12.000 M²
Automated Warehouse: 4.700 M2 with 12 plans and 24.000 places pallet
- Project management of RFID products and containers of semi-finished
- Location and products hostile to the use of radiofrequency
- Integration of Automatic Identification RFID to the warehouse and SAP
- Project 100% compliant with the EPCglobal
- Project candidate RFID Award Italy 2010
Requirements:
- Analysis and re-engineering processes for receiving, quality control and acceptance of finished and semifinished products enabling the company to automate some processes and improve the traceability and the occupation of space.
- Improving the quality of the picking activities and automation of control processes of proper preparation of the UDS.
- Certification and Automation check the load on the cars of the UDS.
- Identification and traceability of the packaging with a perfect bond with the serial engine.
Solution:
- Re-engineering of processes Inflow, Mass in Stock, Picking and Shipping and introduction of RFID technology to support.
- Tagging of the products in the packaging phase at the Community production and sending to the central warehouse.
- Input, control, compliance with and acceptance of products bubble through RFID gates integrated with industrial scale, and delivery of the identified pallet to the automated warehouse.
- Creation of procedures for packaging and labeling with tags neck as a result of the compliance audit of how RFID pallet tracking, and proper loading of the car during shipping.
Results:
- Certain return on investment
- Complete tracking of the Supply Chain (Manufacturer-Dealer)
- Improvement of Post Sales support through access to historical information about single engine troubleshooting, replacement, warranty etc.
- Improving the quality of the service
- Increased rate of passage of material